As Auckland’s waterfront became revitalize, the Viaduct Basin created a gap between Quay Street and the emerging Wynyard Quarter. The solution was Wynyard Crossing. The 330 foot Te Wero Bridge was finished in 2011. Two sections lift within 90 seconds to create a 118 foot channel for passing boats. The bascule bridge is restricted to pedestrians and cyclists.